Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 1250 ft MSL · USGS ground 1258 ft · Δ -8 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate
Cross-source consensus
Corroborated — terrain and structure agree (2/2 sources)
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
The recorded pad is 20 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
80 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
High obstacle within 0.5 nm — conflicts with the expanded footprint and 8:1 approach
Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA compliance
Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationUNKNOWN
FAA OE/AAA airspace determination data integration pending.
Q3 · State enforcementMODERATE
State has partial enforcement framework.
Q4 · NFPA 418PARTIAL
IBC references NFPA 418 for rooftop facilities. Standalone fire code reference not confirmed.
The 80 ft pad is 20 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation1250 ftnot cross-checked
Structurenot on recordGround-level
Pad dimensions80 ft side (filed)80 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.