Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 8 ft MSL · USGS ground 7 ft · Δ 1 ft
Structure cross-check (Overture / OSM)
On a building footprint — height not tagged in the source
Cross-source consensus
⚠ Sources conflict — pad is on a building, but FAA elevation reads ground level
Stale-low FAA elevation (the 6FD8 class) — never updated for the rooftop pad. Treat the recorded elevation as unreliable.
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
The recorded pad is 52 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
48 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
High obstacle within 0.5 nm — conflicts with the expanded footprint and 8:1 approach
Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA compliance
Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationON_FILE
OE/AAA ASN 2024-ASO-2099-NRA: DET-to-Prop
Q3 · State enforcementSTRONG
State has adopted FAA AC as enforceable.
Q4 · NFPA 418ADOPTED
Jurisdiction has adopted NFPA 418 in fire/building code.
FAA facility data
FAA LID
0FD2
AIX ID
aix:hp:YFRVH9WC
Lat / Lng
25.95957, -80.23917
Elevation
8 ft MSL
Pad dimensions
48 × 48 ft
Surface type
CONC
Activation date
1990/01
Last owner update
2025/10/09
FAA OEAAA airspace determinations4
Airspace clearance
On file as archived / procedural records — no standing clearance to track.
Filing activity
Most recent determination 2024-02-12
NRAARCH-DeterminedASN 2024-ASO-2099-NRA2024-04-29
Form 7480 · 0 ft AGL — LAP ASN # 2023-ESA-308-LAP
NRAARCH-DeterminedASN 2023-ASO-2888-NRA2023-04-13
Form 7480 · 100 ft AGL — LAP ASN # 2023-ESA-69-LAP
NRAARCH-DeterminedASN 2022-ASO-7806-NRA2023-02-01
Form 7480 · 0 ft AGL — LAP ASN # 2022-ESA-173-LAP; Proposed relocation and alteration of Helipad H2 at Hard Rock Stadium (0FD2) in Miami Gardens FL. No IFR Procedures are anticipated for the ground level concrete helipad.
NRAARCH-DeterminedASN 2022-ASO-1640-NRA2022-06-06
Form 7480 · 0 ft AGL — LAP ASN # 2022-ESA-35-LAP; Proposal to construct two temporary ground-level helipads at Dolphin Stadium in Miami FL (TLOF: 60'x60' FATO: 90'x90'). No IFR Procedures anticipated.
Safety history (NTSB)1
Accident history
1 NTSB helicopter event within 3 nm since 2010 (1 accident); most recent 2014-12-21.
NTSB helicopter accidents & incidents geocoded within 3 nm of this pad and attributed to the nearest facility — proximity, not a determination that an event occurred at this site. Source: NTSB aviation accident database.
Blueprint
The record vs. what we measured
69/100
DATA INTEGRITY
eVTOL footprint
The 48 ft pad is 52 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation8 ftnot cross-checked
Structurenot on recordOn a building
Pad dimensions48 ft side (filed)48 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.