AirIndex
Why AirIndexPlatform
PublicationsServicesAbout
Discuss a project
§ Predictions Ledger · Rules-based · Public · 58 open · 30 resolved

Forward predictions, resolved against observed events.

Each entry is a rules-based prediction issued when a defined market-signal pattern fired. It resolves when an event matching the rule's criteria is observed in primary-source data within the window — or is marked invalidated or overdue if the window passes without a match. Same structural pattern as rating-agency credit watches and central-bank policy alerts. The discipline is in the rules and the resolution process, not in any single forecast.

58 open · 30 resolved. Reader-tier detail pages document the signal trigger, resolution criteria, and factor reasoning for each.

Methodology note: 50 automated legacy calls were closed as inconclusive at the Forward Signals 2.0 transition. They were not counted as validated or invalidated; the underlying records remain preserved for audit.

§ The Scoreboard · Published forward calls

The calls we put in print, scored.

The specific forward calls AirIndex published in its monthly briefs, One Market Monday, and research — each tracked to resolution against primary-source events. Validated on 33% of 6 resolved calls.

33%
Validated rate
8
Published calls
2
Validated
4
Invalidated
1
On the calendar
1
Overdue
New York, NYInvalidated
Jul 30, 2026 – Aug 30, 2026

First Albany UAM-enabling bill introduction. NY's next +20–30 move requires state legislation; no other factor lever remains given current weights.

▲ +20 pts if realizedPublished in May 2026 Monthly Brief
Phoenix, AZInvalidated
May 31, 2026 – Jun 30, 2026

Arizona SB1457 floor vote. If enacted, hasStateLegislation flips actively_moving→enacted (+10), pushing Phoenix 65→75 and crossing into ADVANCED. If tabled, regression to none (−10). Bill had House committee 'Do Pass' as of May 10; base case leans enacted.

▲ +10 pts if realizedPublished in May 2026 Monthly Brief
Charlotte, NCInvalidated
May 31, 2026 – Jun 30, 2026

Concord airport site progress — a vertiport zoning action or an operator named for the first-phase site. Either would push Charlotte toward 55–60 (MODERATE).

▲ +10 pts if realizedPublished in May 2026 Monthly Brief
Atlanta, GAOverdue
May 31, 2026 – Jun 30, 2026

Federal cohort follow-on or an operator press release naming Atlanta as a tier-2 deployment market. Without it, April's +15 (10→25) is an intra-tier ceiling, not a tier crossing — this call confirms whether the soft April signal escalates.

▲ +0 pts if realizedPublished in May 2026 Monthly Brief
Austin, TXInvalidated
May 18, 2026 – Jun 17, 2026

Any operator-presence signal breaking zero — a high-confidence operator filing (site survey, MOU with a local authority, or service-route announcement). Projected +5 within 30 days.

▲ +5 pts if realizedPublished in One Market Monday
Phoenix, AZValidated
May 12, 2026 – Jun 26, 2026

Arizona registers at least one additional HIGH-confidence AAM-relevant signal — either operator-side (operator market expansion, infrastructure development, facility announcement) or legislative-side (further movement on SB1457 or SB1819, or a new AZ bill entering classification) — within 45 days of Phoenix Volatility publication.

▲ +0 pts if realizedPublished in AirIndex Research
Tampa, FLValidated
May 4, 2026 – Jun 3, 2026

Tampa registers a second high-confidence infrastructure or operator-expansion signal within 30 days of Florida Corridor Thesis publication. Resolves when a new IngestedRecord with affectedCities containing 'tampa' and eventType in {infrastructure_development, operator_market_expansion} is classified at MEDIUM or higher confidence within the window.

▲ +0 pts if realizedPublished in AirIndex Research
Los Angeles, CAOn the calendar
Jul 1, 2026 – Dec 31, 2026

First CA rulemaking under SB 944. If it lands restrictive, regulatoryPosture downgrades friendly→neutral and LA drops 95→90 — the first negative score movement at the top of the index.

▼ -5 pts if realizedPublished in One Market Monday

On the calendar

Miami, FLOn the calendarhigh confidence
Jun 1, 2026 – Dec 31, 2026

Call: Watson Island Heliport reaches operational no faa. Current status: occupancy pending. Developer: Linden Airport Services Corp. d/b/a Watson Island Heliport Corporation.

● validation event (no score change)
Columbus, OHOn the calendarhigh confidence
Jul 7, 2026 – Jul 7, 2027

Joby Aviation acquired real property in Vandalia, OH (Columbus metro) on January 7, 2026 per SEC 8-K filing. Operator-infrastructure forward signal: site is expected to mature toward approvedVertiport=true within the typical 6–18 month site-permitting + ground-prep horizon, producing a ~+10–15 point score move on the Vertiport factor when the milestone fires. Routed from the audit-gate as a real forward signal that is not current-state (Joby owns property; no permits filed, no construction, no operations yet).

▲ +12 pts if realized
San Francisco, CAOn the calendarhigh confidence
Aug 29, 2026 – Sep 28, 2026

faa corridor filing — FAA aeronautical study cycle for corridor or facility determination No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
New York, NYOn the calendarhigh confidence
Sep 8, 2026 – Jan 6, 2027

4 faa certification milestone events tracked (4 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
Cincinnati, OHOn the calendarhigh confidence
Sep 11, 2026 – Nov 10, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Columbus, OHOn the calendarhigh confidence
Sep 18, 2026 – Nov 17, 2026

3 regulatory posture change events tracked (1 high confidence). Regulatory posture shift — typically follows executive order or task force. No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Los Angeles, CAOn the calendarhigh confidence
Oct 9, 2026 – Feb 6, 2027

7 faa certification milestone events tracked (2 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
Orlando, FLOn the calendarhigh confidence
Oct 13, 2026 – Dec 12, 2026

17 regulatory posture change events tracked (9 high confidence). Regulatory posture shift — typically follows executive order or task force. No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Tampa, FLOn the calendarhigh confidence
Oct 13, 2026 – Dec 12, 2026

17 regulatory posture change events tracked (9 high confidence). Regulatory posture shift — typically follows executive order or task force.

▲ +3 pts if realized
New York, NYOn the calendarhigh confidence
Oct 15, 2026 – Mar 14, 2027

14 operator market expansion events tracked (14 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Columbus, OHOn the calendarhigh confidence
Oct 21, 2026 – Jul 23, 2027

7 infrastructure development events tracked (2 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Tampa, FLOn the calendarhigh confidence
Oct 26, 2026 – Mar 25, 2027

20 operator market expansion events tracked (1 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Orlando, FLOn the calendarhigh confidence
Oct 26, 2026 – Mar 25, 2027

24 operator market expansion events tracked (3 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Miami, FLOn the calendarhigh confidence
Oct 26, 2026 – Mar 25, 2027

16 operator market expansion events tracked (1 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Cincinnati, OHOn the calendarhigh confidence
Oct 27, 2026 – Mar 26, 2027

10 operator market expansion events tracked (1 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
San Francisco, CAOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

24 operator market expansion events tracked (10 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Miami, FLOn the calendarhigh confidence
Oct 28, 2026 – Dec 27, 2026

19 regulatory posture change events tracked (9 high confidence). Regulatory posture shift — typically follows executive order or task force. No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Dallas, TXOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

184 operator market expansion events tracked (109 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
San Antonio, TXOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

81 operator market expansion events tracked (27 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Austin, TXOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

81 operator market expansion events tracked (28 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Los Angeles, CAOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

71 operator market expansion events tracked (42 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Houston, TXOn the calendarhigh confidence
Oct 28, 2026 – Mar 27, 2027

86 operator market expansion events tracked (28 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Salt Lake City, UTOn the calendarhigh confidence
Nov 5, 2026 – Mar 5, 2027

10 faa certification milestone events tracked (7 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
Washington D.C., DCOn the calendarhigh confidence
Nov 22, 2026 – Dec 22, 2026

2 faa corridor filing events tracked (1 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
San Antonio, TXOn the calendarhigh confidence
Nov 23, 2026 – Dec 23, 2026

3 faa corridor filing events tracked (2 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
Dallas, TXOn the calendarhigh confidence
Nov 23, 2026 – Dec 23, 2026

3 faa corridor filing events tracked (2 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
Austin, TXOn the calendarhigh confidence
Nov 23, 2026 – Dec 23, 2026

3 faa corridor filing events tracked (2 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
Houston, TXOn the calendarhigh confidence
Nov 23, 2026 – Dec 23, 2026

3 faa corridor filing events tracked (2 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
San Francisco, CAOn the calendarhigh confidence
Dec 3, 2026 – Sep 4, 2027

9 infrastructure development events tracked (3 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Orlando, FLOn the calendarhigh confidence
Dec 12, 2026 – Sep 13, 2027

60 infrastructure development events tracked (27 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Dallas, TXOn the calendarhigh confidence
Dec 15, 2026 – Sep 16, 2027

13 infrastructure development events tracked (7 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Austin, TXOn the calendarhigh confidence
Dec 15, 2026 – Sep 16, 2027

10 infrastructure development events tracked (5 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Houston, TXOn the calendarhigh confidence
Dec 15, 2026 – Sep 16, 2027

10 infrastructure development events tracked (5 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
San Antonio, TXOn the calendarhigh confidence
Dec 15, 2026 – Sep 16, 2027

11 infrastructure development events tracked (6 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Los Angeles, CAOn the calendarhigh confidence
Dec 25, 2026 – Sep 26, 2027

136 infrastructure development events tracked (121 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Miami, FLOn the calendarhigh confidence
Dec 27, 2026 – Sep 28, 2027

16 infrastructure development events tracked (4 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
San Diego, CAOn the calendarmedium confidence
Aug 7, 2026 – Oct 6, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Salt Lake City, UTOn the calendarmedium confidence
Sep 9, 2026 – Feb 6, 2027

2 operator market expansion events tracked (0 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Los Angeles, CAOn the calendarmedium confidence
Sep 10, 2026 – Nov 9, 2026

2 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force. No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

● validation event (no score change)
Columbus, OHOn the calendarmedium confidence
Sep 12, 2026 – Feb 9, 2027

3 operator market expansion events tracked (0 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Salt Lake City, UTOn the calendarmedium confidence
Sep 12, 2026 – Jun 14, 2027

infrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Chicago, ILOn the calendarmedium confidence
Sep 26, 2026 – Nov 25, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force

▲ +3 pts if realized
Tampa, FLOn the calendarmedium confidence
Oct 1, 2026 – Dec 31, 2027

Florida DOT plans to redirect ~$200M in unspent NEVI (EV-charger) federal funds into 32 eVTOL landing pads statewide (~$5.6M per site), under HB 1093 (signed 2026-04-20, effective 2026-07-01), which authorizes FDOT to fund up to 100% of public vertiport construction. Orlando's first vertistop was approved 2026-07-16 with construction targeted for Oct 2026. No Tampa site has been designated yet — which is exactly what this prediction tracks: a funded FDOT pad site named in the Tampa market would fire approvedVertiport (with zoning riding along), the market's stated gap in OMM #10. Routed from the audit gate as a real forward signal that is not current-state (program funded and legally enabled; no Tampa site, no permit, no construction).

▲ +12 pts if realized
San Diego, CAOn the calendarmedium confidence
Oct 5, 2026 – Feb 2, 2027

4 faa certification milestone events tracked (0 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
San Francisco, CAOn the calendarmedium confidence
Oct 5, 2026 – Feb 2, 2027

4 faa certification milestone events tracked (0 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
Salt Lake City, UTOn the calendarmedium confidence
Oct 12, 2026 – Nov 11, 2026

4 faa corridor filing events tracked (0 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.

● validation event (no score change)
Phoenix, AZOn the calendarmedium confidence
Oct 17, 2026 – Dec 16, 2026

3 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force.

▲ +3 pts if realized
Charlotte, NCOn the calendarmedium confidence
Oct 25, 2026 – Dec 24, 2026

2 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force.

▲ +3 pts if realized
Charlotte, NCOn the calendarmedium confidence
Oct 28, 2026 – Mar 27, 2027

16 operator market expansion events tracked (0 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
San Diego, CAOn the calendarmedium confidence
Oct 28, 2026 – Mar 27, 2027

12 operator market expansion events tracked (0 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.

● validation event (no score change)
Cincinnati, OHOn the calendarmedium confidence
Nov 2, 2026 – Aug 4, 2027

infrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
New York, NYOn the calendarmedium confidence
Nov 2, 2026 – Aug 4, 2027

3 infrastructure development events tracked (0 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Seattle, WAOn the calendarmedium confidence
Nov 9, 2026 – Aug 11, 2027

infrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Las Vegas, NVOn the calendarmedium confidence
Nov 12, 2026 – Aug 14, 2027

infrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Cincinnati, OHOn the calendarmedium confidence
Nov 12, 2026 – Mar 12, 2027

faa certification milestone — Aircraft certification milestone — typically precedes operator deployment by 2-6 months No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.

● validation event (no score change)
San Diego, CAOn the calendarmedium confidence
Dec 3, 2026 – Sep 4, 2027

infrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)
Tampa, FLOn the calendarmedium confidence
Dec 5, 2026 – Sep 6, 2027

14 infrastructure development events tracked (0 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.

● validation event (no score change)

Resolved

Austin, TXOverdue
Resolved Sep 28, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

Outcome: Window expired without resolving outcome event.

Dallas, TXOverdue
Resolved Sep 28, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

Outcome: Window expired without resolving outcome event.

Houston, TXOverdue
Resolved Sep 28, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.

Outcome: Window expired without resolving outcome event.

San Antonio, TXInvalidated
Resolved Sep 27, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force

Outcome: predicted 3, actual -1 (opposite direction)

Orlando, FLInconclusive
Resolved Sep 2, 2026

SunTrax Air — Florida AAM Headquarters (under construction) — FDOT

Outcome: Administrative data correction: faa_registered was already effective 2025-11-30, before this call was generated; excluded from accuracy.

Houston, TXOverdue
Resolved Aug 12, 2026

3 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force. Validation event only — houston already has full credit on regulatoryPosture.

Outcome: Window expired without resolving outcome event.

Dallas, TXOverdue
Resolved Aug 12, 2026

3 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force. Validation event only — dallas already has full credit on regulatoryPosture.

Outcome: Window expired without resolving outcome event.

Austin, TXOverdue
Resolved Aug 12, 2026

3 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force. Validation event only — austin already has full credit on regulatoryPosture.

Outcome: Window expired without resolving outcome event.

Houston, TXInvalidated
Resolved Aug 12, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: predicted positive, actual -12

San Antonio, TXValidated
Resolved Aug 12, 2026

Market shows negative momentum; watch flagged deteriorating

Outcome: DETERIORATING confirmed: -4

Phoenix, AZInvalidated
Resolved Jul 31, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force

Outcome: predicted 5, actual -16 (opposite direction)

Cincinnati, OHOverdue
Resolved Jul 27, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: Window expired without resolving outcome event.

Denver, COOverdue
Resolved Jul 11, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: Window expired without resolving outcome event.

Phoenix, AZInvalidated
Resolved Jul 10, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: predicted positive, actual -16

Orlando, FLValidated
Resolved Jul 10, 2026

Market shows negative momentum; watch flagged deteriorating

Outcome: DETERIORATING confirmed: -23

Austin, TXValidated
Resolved Jul 10, 2026

Market shows negative momentum; watch flagged deteriorating

Outcome: DETERIORATING confirmed: -4

Columbus, OHValidated
Resolved Jul 10, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: IMPROVING confirmed: +3

Miami, FLInvalidated
Resolved Jul 10, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: predicted positive, actual -26

San Francisco, CAInvalidated
Resolved Jul 10, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: predicted positive, actual -18

San Diego, CAInvalidated
Resolved Jul 10, 2026

Market shows positive momentum across recent signals; watch flagged improving

Outcome: predicted positive, actual -13

Tampa, FLValidated
Resolved Jul 10, 2026

Market shows negative momentum; watch flagged deteriorating

Outcome: DETERIORATING confirmed: -2

Dallas, TXValidated
Resolved Jul 10, 2026

Market shows negative momentum; watch flagged deteriorating

Outcome: DETERIORATING confirmed: -1

San Francisco, CAInvalidated
Resolved Jun 16, 2026

regulatory posture change — Regulatory posture shift — typically follows executive order or task force

Outcome: predicted 5, actual -13 (opposite direction)

Tampa, FLValidated
Resolved May 28, 2026

8 regulatory posture change events tracked (1 high confidence). Regulatory posture shift — typically follows executive order or task force.

Outcome: regulatory_filing matched predicted positive direction (Score gate published — regulatoryPosture=friendly for tampa. [NLP] Florida DOT and Embry-Riddle hosting AAM summit signals friendly state regulatory posture; applied to all tracked)

San Antonio, TXValidated
Resolved May 22, 2026

6 regulatory posture change events tracked (0 high confidence). Regulatory posture shift — typically follows executive order or task force.

Outcome: regulatory_filing matched predicted positive direction (Score gate published — regulatoryPosture=friendly for san_antonio. [NLP] San Antonio invests $42M to prepare for air taxi future, indicating friendly regulatory posture and vertipo)

Miami, FLValidated
Resolved May 6, 2026

8 regulatory posture change events tracked (1 high confidence). Regulatory posture shift — typically follows executive order or task force. Validation event only — miami already has full credit on regulatoryPosture.

Outcome: Validation event landed: regulatory_filing (Score gate published — regulatoryPosture=friendly for miami. [NLP] Florida state funding initiative for vertiports signals friendly regulatory posture toward UAM in Florida's tracked markets (Miami, O)

Want the rule trigger and resolution criteria? Click any prediction above to read the signal that fired the rule, what would count as validation, and the factor-level reasoning — open to read.
Entity
Vertical Data Group, LLCSouth Carolinaverticaldatagroup.com ↗
Products & Surfaces
AirIndexScored MarketsAAM Activity RadarLanding RecordHelipad CheckLegislation TrackerObserved OperationsELIPAPIWhy AirIndexMethodologyPublicationsPredictions LedgerServices
Contact
ContactInvestorsPartnershipsDesign Partner ProgramNewsroomCorrections & AppealsAnalytical Independence
TermsPrivacy
LinkedIn ↗
AirIndex is a Vertical Data Group product.
© 2026 Vertical Data Group, LLC. All rights reserved.