Get an email when the record for Sky-5 changes: its FAA registration, pad data, nearby FAA airspace determinations, or AirIndex findings. A weekly digest arrives only when something changed.
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 400 ft MSL · USGS ground 393 ft · Δ 7 ft
Structure cross-check (Overture / OSM)
Rooftop pad — the coordinate falls on a building footprint
Building height ≈ 21 ft — measured independently of the FAA record
Cross-source consensus
⚠ Sources conflict — pad is on a building, but FAA elevation reads ground level
Stale-low FAA elevation (the 6FD8 class) — never updated for the rooftop pad. Treat the recorded elevation as unreliable.
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
eVTOL readiness
INFEASIBLE WITHOUT REMEDIATIONConversion feasibility · four readings, one line each
Obstruction screen
Severe
High obstacle within 0.5 nm conflicts with the expanded footprint and the 8:1 approach surface.
Geometry
Requires 80 feet of expansion
Recorded pad side 20 ft against a 100 ft eVTOL FATO.
Structural FATO
Unverified
The full 100 × 100 ft FATO must be load-bearing. The FAA does not record structural capacity, so no record can confirm it.
Overall
Infeasible without remediation
A high obstacle conflicts with the expanded footprint. Remediation or a different site.
The recorded pad is 80 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
20 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Measured against FAA pad geometry and federal FATO sizing (EB-105). The obstruction screen is the only reading the engine verdict rests on; geometry and structural capacity are stated separately and never folded into it. A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA compliance
Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationUNKNOWN
FAA OE/AAA airspace determination data integration pending.
Q3 · State enforcementLIMITED
State has limited enforcement of FAA standards.
Q4 · NFPA 418PARTIAL
IBC references NFPA 418 for rooftop facilities. Standalone fire code reference not confirmed.
FAA facility data
FAA LID
2NC3
AIX ID
aix:hp:S4QVKFGP
Lat / Lng
35.77960, -78.67417
Elevation
400 ft MSL
Pad dimensions
20 × 20 ft
Surface type
WOOD
Surface condition
FAIR
Activation date
1982/04
Last owner update
2019/10/21
FAA OEAAA airspace determinations0
No FAA OEAAA determinations linked to this facility.
Blueprint
The record vs. what we measured
53/100
DATA INTEGRITY
Surface elevation
The FAA record places this pad at 400 ft. USGS terrain plus the building put the actual rooftop at 414 ft — a +14 ft difference the federal record doesn’t carry.
eVTOL footprint
The 20 ft pad is 80 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation400 ft414 ft · USGS+structure
Structurenot on recordRooftop pad
Pad dimensions20 ft side (filed)20 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.