Get an email when the record for Air Eye Med Helistop changes: its FAA registration, pad data, nearby FAA airspace determinations, or AirIndex findings. A weekly digest arrives only when something changed.
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 30 ft MSL · USGS ground 30 ft · Δ 0 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate
Cross-source consensus
Corroborated — terrain and structure agree (2/2 sources)
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
eVTOL readiness
CONDITIONALConversion feasibility · four readings, one line each
Obstruction screen
Clear
No obstructions within 0.5 nm on the FAA obstacle file.
Geometry
Requires 67 feet of expansion
Recorded pad side 33 ft against a 100 ft eVTOL FATO.
Structural FATO
Unverified
The full 100 × 100 ft FATO must be load-bearing. The FAA does not record structural capacity, so no record can confirm it.
Overall
Conditional
Obstruction screen passed. Geometry and structural capacity remain open. Site validation required.
The recorded pad is 67 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
33 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Measured against FAA pad geometry and federal FATO sizing (EB-105). The obstruction screen is the only reading the engine verdict rests on; geometry and structural capacity are stated separately and never folded into it. A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
Jurisdiction has adopted NFPA 418 in fire/building code.
FAA facility data
FAA LID
43FA
AIX ID
aix:hp:CZ3R0PB7
Lat / Lng
27.93181, -82.28983
Elevation
30 ft MSL
Pad dimensions
33 × 33 ft
Surface type
CONC
Activation date
2022/01
FAA OEAAA airspace determinations3
Airspace clearance
On file as archived / procedural records — no standing clearance to track.
Filing activity
Most recent determination 2021-05-11
NRAARCH-DeterminedASN 2021-ASO-2586-NRA2021-11-12
Heliport · 0 ft AGL — LAP ASN # 2021-ESA-69-LAP\r\n\r\nPrevious Case: 2017-ASO-1257-NRA
NRAARCH-DeterminedASN 2017-ASO-1257-NRA2021-04-01
Form 7480 · 0 ft AGL — Proposal for a new privately owned private use heliport. Proposed Air-Med Eye Care Heliport Brandon FL Hillsborough County. The helipad will be located on a dock on Clayton Lake; TLOF: 33' x 33' FATO: 58' x 58'. No IFR Procedures anticipated. A previous airspace study was performed for the helipad (2008-ASO-1140-NRA) but the determination has expired.
NRAARCH-DeterminedASN 2008-ASO-1140-NRA2009-07-08
Heliport · 0 ft AGL — This case is for the establishment of a new private use Heliport in Brandon FL. See attached documents for more information. \r\n\r\nThe site is located nearby another private use hospital heliport.
Blueprint
The record vs. what we measured
73/100
DATA INTEGRITY
eVTOL footprint
The 33 ft pad is 67 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation30 ftnot cross-checked
Structurenot on recordGround-level
Pad dimensions33 ft side (filed)33 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.