AirIndex Research · FAA LID 64WA

EVERETT I

BELLEVUE, WA — Seattle metro. Operational · Private use.

OperationalPrivate usePrivate
← All Seattle heliports
Loading satellite view…

Data integrity

57/100
Self-reportedData Integrity Index
Independent inspection
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 150 ft MSL · USGS ground 153 ft · Δ -3 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate

Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →

eVTOL readiness

FeasibleConversion feasibility · obstruction screen
100 ft · eVTOL FATO150 ft
This pad already covers the eVTOL landing footprint as it stands.
recorded pad eVTOL FATO
Recorded pad (limiting side)
150 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
Clear — no obstructions within 0.5 nm on the FAA obstacle file

Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.

FAA compliance

Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationUNKNOWN
FAA OE/AAA airspace determination data integration pending.
Q3 · State enforcementMODERATE
State has partial enforcement framework.
Q4 · NFPA 418UNKNOWN
NFPA 418 adoption status not yet assessed for this jurisdiction.

FAA facility data

FAA LID
64WA
AIX ID
aix:hp:JHWH49PY
Lat / Lng
47.62523, -122.17040
Elevation
150 ft MSL
Activation date
1992/10
Last owner update
2021/08/27

FAA OEAAA airspace determinations0

No FAA OEAAA determinations linked to this facility.

Full risk assessment

This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.

Request the full assessment

Building autonomous systems? See the machine-verified feed

Provenance FAA NASR 5010 · pad dims APT cycle 2026/03/19 · USGS 3DEP terrain · Overture structure · eVTOL screen conversion-feasibility-1.1 · AIX-ID aix:hp:JHWH49PY · Methodology →
← All Seattle heliports