Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
The recorded pad is 60 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
40 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
High obstacle within 0.5 nm — conflicts with the expanded footprint and 8:1 approach
Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA facility data
FAA LID
65IL
AIX ID
aix:hp:QN0KNTCD
Lat / Lng
37.81590, -88.44361
Elevation
422 ft MSL
Pad dimensions
40 × 40 ft
Surface type
CONC
Activation date
2026/06
FAA OEAAA airspace determinations0
No FAA OEAAA determinations linked to this facility.
Blueprint
The record vs. what we measured
eVTOL footprint
The 40 ft pad is 60 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation422 ftnot cross-checked
Structurenot on recordnot cross-checked
Pad dimensions40 ft side (filed)40 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.