AirIndex Research · FAA LID 6NK3
NORTH SHORE UNIVERSITY HOSPITAL NR 2
MANHASSET, NY — New York metro. Operational · Private use.
OperationalPrivate usePrivate
← All New York heliportsData integrity
57/100
Self-reportedData Integrity IndexIndependent inspection
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 153 ft MSL · USGS ground 152 ft · Δ 1 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
eVTOL readiness
InfeasibleConversion feasibility · obstruction screen
The recorded pad is 40 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
60 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
High obstacle within 0.5 nm — conflicts with the expanded footprint and 8:1 approach
Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA compliance
Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationUNKNOWN
FAA OE/AAA airspace determination data integration pending.
Q3 · State enforcementMODERATE
State has partial enforcement framework.
Q4 · NFPA 418ADOPTED
Jurisdiction has adopted NFPA 418 in fire/building code.
FAA facility data
FAA LID
6NK3
AIX ID
aix:hp:3P821YAD
Lat / Lng
40.77521, -73.69984
Elevation
153 ft MSL
Activation date
1999/02
Last owner update
2025/07/01
FAA OEAAA airspace determinations0
No FAA OEAAA determinations linked to this facility.
Full risk assessment
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.
Request the full assessmentBuilding autonomous systems? See the machine-verified feed
Provenance FAA NASR 5010 · pad dims APT cycle 2026/03/19 · USGS 3DEP terrain · Overture structure · eVTOL screen conversion-feasibility-1.1 · AIX-ID aix:hp:3P821YAD · Methodology →