Get an email when the record for Timberview Helicopters changes: its FAA registration, pad data, nearby FAA airspace determinations, or AirIndex findings. A weekly digest arrives only when something changed.
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 16 ft MSL · USGS ground 18 ft · Δ -2 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate
Cross-source consensus
Corroborated — terrain and structure agree (2/2 sources)
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
eVTOL readiness
INFEASIBLE WITHOUT REMEDIATIONConversion feasibility · four readings, one line each
Obstruction screen
Severe
High obstacle within 0.5 nm conflicts with the expanded footprint and the 8:1 approach surface.
Geometry
Requires 50 feet of expansion
Recorded pad side 50 ft against a 100 ft eVTOL FATO.
Structural FATO
Unverified
The full 100 × 100 ft FATO must be load-bearing. The FAA does not record structural capacity, so no record can confirm it.
Overall
Infeasible without remediation
A high obstacle conflicts with the expanded footprint. Remediation or a different site.
The recorded pad is 50 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
50 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Measured against FAA pad geometry and federal FATO sizing (EB-105). The obstruction screen is the only reading the engine verdict rests on; geometry and structural capacity are stated separately and never folded into it. A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
FAA compliance
Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationON_FILE
OE/AAA ASN 2025-ASO-1143-OE: DET-EBO-TMP
Q3 · State enforcementSTRONG
State has adopted FAA AC as enforceable.
Q4 · NFPA 418ADOPTED
Jurisdiction has adopted NFPA 418 in fire/building code.
FAA facility data
FAA LID
8FL5
AIX ID
aix:hp:0CNA57CS
Lat / Lng
30.38825, -86.43331
Elevation
16 ft MSL
Pad dimensions
50 × 50 ft
Surface type
ASPH-CONC
Surface condition
FAIR
Activation date
2020/08
Last owner update
2022/08/11
FAA OEAAA airspace determinations4
Airspace clearance
Airspace clearance on file has lapsed — a re-filing may be needed for new/continued operations. Does not by itself reclassify the existing structure as a hazard.
CRANE · 220 ft AGL — Temporary Crane for New Water Tower
NRAARCH-DeterminedASN 2020-ASO-1768-NRA2020-08-26
Heliport · 1 ft AGL — LAP ASN # 2020-ESA-64-LAP Activate a private heliport and 5010 submittal. Previously evaluated under 2012-ASO-111-NRA
NRAARCH-DeterminedASN 2012-ASO-111-NRA2012-04-19
Heliport · 0 ft AGL — Construct new concrete (25' x 25' inner) and asphalt (75' x 75' outer) helipad at LAT 30°23'17.70\ LONG 86°25'59.69\ FATO 130' x 200' and TLOF 75' x 75' with INGRESS/EGRESS (1) 045°/215° and (2) 125°/315°.
Blueprint
The record vs. what we measured
73/100
DATA INTEGRITY
eVTOL footprint
The 50 ft pad is 50 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation16 ftnot cross-checked
Structurenot on recordGround-level
Pad dimensions50 ft side (filed)50 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.