AirIndex Research · FAA LID 93NY

TAYLOR FLD AT FORT HAMILTON

BROOKLYN, NY — New York metro. Operational · Private use.

OperationalPrivate usePrivate
← All New York heliports
Loading satellite view…

Data integrity

67/100
CorroboratedData Integrity Index
Independent inspection
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 19 ft MSL · USGS ground 21 ft · Δ -2 ft
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate

Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →

eVTOL readiness

FeasibleConversion feasibility · obstruction screen
100 ft · eVTOL FATO150 ft
This pad already covers the eVTOL landing footprint as it stands.
recorded pad eVTOL FATO
Recorded pad (limiting side)
150 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Obstruction clearance
Clear — no obstructions within 0.5 nm on the FAA obstacle file

Measured against FAA pad geometry and federal FATO sizing (EB-105). A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.

FAA compliance

Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationUNKNOWN
FAA OE/AAA airspace determination data integration pending.
Q3 · State enforcementMODERATE
State has partial enforcement framework.
Q4 · NFPA 418ADOPTED
Jurisdiction has adopted NFPA 418 in fire/building code.

FAA facility data

FAA LID
93NY
AIX ID
aix:hp:ERWFR4ED
Lat / Lng
40.60529, -74.02226
Elevation
19 ft MSL
Activation date
2012/12
Last owner update
2012/09/28

FAA OEAAA airspace determinations0

No FAA OEAAA determinations linked to this facility.

Full risk assessment

This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.

Request the full assessment

Building autonomous systems? See the machine-verified feed

Provenance FAA NASR 5010 · pad dims APT cycle 2026/03/19 · USGS 3DEP terrain · Overture structure · eVTOL screen conversion-feasibility-1.1 · AIX-ID aix:hp:ERWFR4ED · Methodology →
← All New York heliports