AirIndex Research · FAA LID WA11

HARTFORD INDUSTRIAL

LAKE STEVENS, WA. Closed indefinitely · Private use.

Closed indefinitelyPrivate usePrivate

Watch this facility

Get an email when the record for Hartford Industrial changes: its FAA registration, pad data, nearby FAA airspace determinations, or AirIndex findings. A weekly digest arrives only when something changed.

Already a reader? Sign in to watch it
Loading satellite view…

Data integrity

66/100
CorroboratedData Integrity Index
Independent inspection
Owner self-reported — never independently field-inspected
Location confidence
⚠ Location-suspect — recorded coordinates may be mislocated
Terrain cross-check (USGS 3DEP)
FAA 360 ft MSL · USGS ground 243 ft · Δ 117 ft
Differential consistent with an elevated / rooftop pad
Structure cross-check (Overture / OSM)
Ground-level — no building footprint at the coordinate
Cross-source consensus
⚠ Sources conflict — FAA elevation sits above terrain, but no building is at the coordinate
Either a freestanding / tower pad or a mislocated coordinate — independent verification recommended.

Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →

eVTOL readiness

CONDITIONALConversion feasibility · four readings, one line each
Obstruction screen
Clear
No obstructions within 0.5 nm on the FAA obstacle file.
Geometry
Requires 76 feet of expansion
Recorded pad side 24 ft against a 100 ft eVTOL FATO.
Structural FATO
Unverified
The full 100 × 100 ft FATO must be load-bearing. The FAA does not record structural capacity, so no record can confirm it.
Overall
Conditional
Obstruction screen passed. Geometry and structural capacity remain open. Site validation required.
100 ft · eVTOL FATO
The recorded pad is 76 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
24 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.

Measured against FAA pad geometry and federal FATO sizing (EB-105). The obstruction screen is the only reading the engine verdict rests on; geometry and structural capacity are stated separately and never folded into it. A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.

FAA compliance

Q1 · FAA registrationPASS
Active FAA NASR 5010 record.
Q2 · Airspace determinationON_FILE
OE3A archive: ASN 2019-ANM-1644-NRA determined 2019-10-18
Q3 · State enforcementMODERATE
State has partial enforcement framework.
Q4 · NFPA 418UNKNOWN
NFPA 418 adoption status not yet assessed for this jurisdiction.

FAA facility data

FAA LID
WA11
AIX ID
aix:hp:Z22226R9
Lat / Lng
48.02446, -122.05788
Elevation
360 ft MSL
Activation date
2020/04

FAA OEAAA airspace determinations1

Airspace clearance
On file as archived / procedural records — no standing clearance to track.
Filing activity
Most recent determination 2019-05-29
  • NRAARCH-DeterminedASN 2019-ANM-1644-NRA
    2019-10-18
    Form 7480 · 0 ft AGL — LAP ASN # 2019-WSA-34-LAP\r\nESTABLISH NEW HELIPAD ON PROPERTY ZONED INDUSTRIAL AND OWNED BY THE APPLICANT.
Blueprint
The record vs. what we measured
66/100
DATA INTEGRITY
eVTOL footprint
FATO 100 ft reqHTLOF 24 ft

The 24 ft pad is 76 ft short of the 100 ft an eVTOL FATO requires (measured).

SIGNALFEDERAL RECORDMEASURED
Surface elevation360 ftnot cross-checked
Structurenot on recordGround-level
Pad dimensionsnot on file24 ft side · measured
Coordinate integrityas filed⚠ location-suspect
Independent inspectionowner self-reportednone on record
Federal record
Cross-checkedUSGS · Overture · dimensions
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
Request Ground Truth verification

Full risk assessment

This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.

Request the full assessment

Building autonomous systems? See the machine-verified feed

Provenance FAA NASR 5010 · pad dims APT cycle 2026/03/19 · USGS 3DEP terrain · Overture structure · eVTOL screen conversion-feasibility-1.1 · AIX-ID aix:hp:Z22226R9 · Methodology →
Cite this facility

HARTFORD INDUSTRIAL, LAKE STEVENS, WA (FAA WA11). AirIndex facility record aix:hp:Z22226R9. Verifiable at https://www.airindex.io/verify/aix:hp:Z22226R9.

Verify this record →

AIX-IDs are free to cite and reference; the registry is the source of record. The verify link resolves this record against the audit chain.

← All markets