Get an email when the record for Laredo Medical Center changes: its FAA registration, pad data, nearby FAA airspace determinations, or AirIndex findings. A weekly digest arrives only when something changed.
Owner self-reported — never independently field-inspected
Location confidence
No coordinate anomaly detected
Terrain cross-check (USGS 3DEP)
FAA 466 ft MSL · USGS ground 466 ft · Δ 0 ft
Structure cross-check (Overture / OSM)
On a building footprint — height not tagged in the source
Cross-source consensus
⚠ Sources conflict — pad is on a building, but FAA elevation reads ground level
Stale-low FAA elevation (the 6FD8 class) — never updated for the rooftop pad. Treat the recorded elevation as unreliable.
Cross-checked against independent public data — USGS 3DEP terrain, Overture/OSM building footprints, the federal hospital registry, and measured dimensions. The State of the U.S. Heliport Record →
eVTOL readiness
INFEASIBLE WITHOUT REMEDIATIONConversion feasibility · four readings, one line each
Obstruction screen
Severe
High obstacle within 0.5 nm conflicts with the expanded footprint and the 8:1 approach surface.
Geometry
Requires 40 feet of expansion
Recorded pad side 60 ft against a 100 ft eVTOL FATO.
Structural FATO
Unverified
The full 100 × 100 ft FATO must be load-bearing. The FAA does not record structural capacity, so no record can confirm it.
Overall
Infeasible without remediation
A high obstacle conflicts with the expanded footprint. Remediation or a different site.
The recorded pad is 40 ft short of the 100 ft footprint an eVTOL would need — shown to scale.
recorded pad eVTOL FATO
Recorded pad (limiting side)
60 ft
eVTOL FATO required
100 ft
FAA EB-105 vertiport pattern — 2× a ~50 ft eVTOL controlling dimension, plus a 125 ft safety-area side.
Load-bearing FATO
100 × 100 ft must be structural
No heliport precedent — typically the binding gate for rooftop and hospital pads.
Measured against FAA pad geometry and federal FATO sizing (EB-105). The obstruction screen is the only reading the engine verdict rests on; geometry and structural capacity are stated separately and never folded into it. A dimensional pre-screen — site-level validation required, and independent of the underwriting risk score.
IBC references NFPA 418 for rooftop facilities. Standalone fire code reference not confirmed.
FAA facility data
FAA LID
XA22
AIX ID
aix:hp:VSWBC031
Lat / Lng
27.53395, -99.47785
Elevation
466 ft MSL
Pad dimensions
60 × 60 ft
Surface type
CONC
Activation date
2004/06
Last owner update
2025/06/29
FAA OEAAA airspace determinations3
Airspace clearance
On file as archived / procedural records — no standing clearance to track.
Filing activity
Most recent determination 2010-02-24
NRAARCH-DeterminedASN 2010-ASW-315-NRA2010-12-20
Heliport · 0 ft AGL — Relocating Existing Heliport\r\nCorrecting Poor Data
NRAARCH-DeterminedASN 2003-ASW-837-NRA2004-01-20
Other · 0 ft AGL — Establish private-use hospital heliport. Heliport already present.
NRAARCH-DeterminedASN 1998-ASW-5500-NRA1998-10-07
Other · 0 ft AGL — EST HOSP. HELIPORT/FATO IS 65' X 65'/TLOF IS 40' X 40'/SURFACE ISESTABLISH HELIPORT
Blueprint
The record vs. what we measured
63/100
DATA INTEGRITY
eVTOL footprint
The 60 ft pad is 40 ft short of the 100 ft an eVTOL FATO requires (measured).
SIGNALFEDERAL RECORDMEASURED
Surface elevation466 ftnot cross-checked
Structurenot on recordOn a building
Pad dimensions60 ft side (filed)60 ft side · measured
Coordinate integrityas filedterrain cross-checked
Independent inspectionowner self-reportednone on record
✓Federal record
→
✓Cross-checkedUSGS · Overture · dimensions
→
3Physically verifiedGround Truth capture
Obstructions, exact FATO geometry, surface condition, and downwash exposure require a physical Ground Truth capture — not shown above as measured. A field verification completes the record and writes the measured truth to this facility’s authority.
This page is the public data-integrity record. The full RiskIndex assessment — Q1–Q5 compliance, dimensional / FATO analysis, an underwriting-grade risk score, peer benchmark, and a sealed Site Intelligence Report — is available on request.