Miami forward signals
Predictive surface — what the platform projects, when each call is expected to resolve, and the score impact if realized. Resolutions feed the public Predictions Ledger.
1112 OE/AAA determinations in the development footprint — 783 structures studied near airspace, tallest 1051 ft AGL; 446 crane/construction filings; 15 facility airspace studies.
Cumulative airspace-study footprint from FAA OE/AAA determinations geo-matched to this market — a development-intent indicator (towers, helipads, cranes studied for airspace effect). Density & composition, not a velocity claim.
Near-term (≤ 60 days)5
- Regulatoryhigh30-90 days12 regulatory posture change events tracked (3 high confidence). Regulatory posture shift — typically follows executive order or task force. Validation event only — miami already has full credit on regulatoryPosture.12 events classified in last 90d, most recent 2026-06-30
- Operatorhigh30-180 days for operational follow-up23 operator market expansion events tracked (4 high confidence). Operator announcement — follow-on operational events typically follow. Validation event only — miami already has full credit on activeOperatorPresence.23 events classified in last 90d, most recent 2026-06-20
- Infrastructuremedium60-90 days from filing3 faa corridor filing events tracked (0 high confidence). FAA aeronautical study cycle for corridor or facility determination. Validation event only — miami already has full credit on approvedVertiport.
Medium-term (60–180 days)1
- Infrastructurehigh3-12 months for build/permit cycle12 infrastructure development events tracked (4 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. Validation event only — miami already has full credit on approvedVertiport.12 events classified in last 90d, most recent 2026-06-30
Long-term (180+ days or unscheduled)4
- Infrastructurelowannounced; no firm timelineMagic City Innovation District Vertiport (announced) — Dragon Global / Magic City Innovation DistrictPublic announcement only — no permit filings on record · source
- Infrastructurelowannounced; no firm timelineRelated Ross Downtown West Palm Beach Vertiport (announced) — Related RossPublic announcement only — no permit filings on record · source
- Infrastructurelow
Each forward signal here resolves against the public Predictions Ledger. First verifications start June 16, 2026; the public scoreboard ships with Pulse Issue 6 in July, after which every Pulse carries a running “Last Month's Calls” track record.
Need more depth on Miami?
The above is the light analytical layer. Institutional engagements unlock primary-source citations per factor, historical factor-level snapshots, methodology overrides with rationale, and analyst notes — at the depth a deployment decision actually requires.
Talk to us about depth access