Miami forward signals
Dated event calls with explicit resolution windows and direct AIS v2.0 score impact only where it is computable. Resolutions feed the public Predictions Ledger.
1623 OE/AAA determinations in the development footprint — 1143 structures studied near airspace, tallest 1051 ft AGL; 814 crane/construction filings; 20 facility airspace studies.
Cumulative airspace-study footprint from FAA OE/AAA determinations geo-matched to this market — a development-intent indicator (towers, helipads, cranes studied for airspace effect). Density & composition, not a velocity claim.
Near-term (≤ 60 days)3
- Regulatoryhigh30-90 days19 regulatory posture change events tracked (9 high confidence). Regulatory posture shift — typically follows executive order or task force. No direct AIS v2.0 score delta: No projected score change: regulatory posture is already friendly.19 events classified in last 90d, most recent 2026-09-28
- Operatorhigh30-180 days for operational follow-up16 operator market expansion events tracked (1 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.16 events classified in last 90d, most recent 2026-09-26
- Infrastructurehightarget: operational no faa by 2026Call: Watson Island Heliport reaches operational no faa. Current status: occupancy pending. Developer: Linden Airport Services Corp. d/b/a Watson Island Heliport Corporation.
Medium-term (60–180 days)1
- Infrastructurehigh3-12 months for build/permit cycle16 infrastructure development events tracked (4 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.16 events classified in last 90d, most recent 2026-09-28
Long-term (180+ days or unscheduled)4
- Infrastructurelowannounced; no firm timelineCall: Magic City Innovation District Vertiport reaches permitting. Current status: announced. Developer: Dragon Global / Magic City Innovation District.Public announcement only — no permit filings on record · source
- Infrastructurelowannounced; no firm timelineCall: Related Ross Downtown West Palm Beach Vertiport reaches permitting. Current status: announced. Developer: Related Ross.Public announcement only — no permit filings on record · source
- Infrastructure
Each forward signal here resolves against the public Predictions Ledger. First verifications start June 16, 2026; the public scoreboard ships with Pulse Issue 6 in July, after which every Pulse carries a running “Last Month's Calls” track record.
Need more depth on Miami?
The above is the light analytical layer. Institutional engagements unlock primary-source citations per factor, historical factor-level snapshots, methodology overrides with rationale, and analyst notes — at the depth a deployment decision actually requires.
Talk to us about depth access