AAM activity in Montgomery, AL
We have detected 4 Advanced Air Mobility signals in Montgomery in the public record — infrastructure. Montgomery is not in our scored readiness index; this is the activity we are watching, with its source.
A readiness score is a deliberate, audited judgment we reserve for the tracked index. Everything below is detected signal, traceable to where we found it.
The signal trail
FAA Advanced Air Mobility airspace case 2023-ASO-6203-NRA (determined 2023-07-31): Filing for Permanent Construction:\r\nMontgomery Regional Airport - Electric Aircraft Charging Station. Height listed is for Proposed DCFC Dispenser (Airplane).
oe3a-aam-case →FAA Advanced Air Mobility airspace case 2023-ASO-6204-NRA (determined 2023-07-31): Filing for Permanent Construction:\r\nMontgomery Regional Airport - Electric Aircraft Charging Station. Height listed is for proposed utility transformer.
oe3a-aam-case →FAA Advanced Air Mobility airspace case 2023-ASO-6205-NRA (determined 2023-07-31): Filing for Permanent Construction:\r\nMontgomery Regional Airport - Electric Aircraft Charging Station. Height listed is for proposed level 2 dual port charger (automobile).
oe3a-aam-case →FAA Advanced Air Mobility airspace case 2023-ASO-6202-NRA (determined 2023-07-31): Filing for temporary construction: \r\nMontgomery Regional Airport - Electric Aircraft Charging Station. Height listed is for temporary construction equipment.
oe3a-aam-case →Building AAM in Montgomery?
Tell us what you are seeing on the ground. We can share what we are tracking, and it helps us decide which markets to bring into the scored index next.
Get in touch →