San Antonio forward signals
Dated event calls with explicit resolution windows and direct AIS v2.0 score impact only where it is computable. Resolutions feed the public Predictions Ledger.
183 OE/AAA determinations in the development footprint — 59 structures studied near airspace, tallest 350 ft AGL; 34 crane/construction filings; 75 facility airspace studies.
Cumulative airspace-study footprint from FAA OE/AAA determinations geo-matched to this market — a development-intent indicator (towers, helipads, cranes studied for airspace effect). Density & composition, not a velocity claim.
Near-term (≤ 60 days)2
- Operatorhigh30-180 days for operational follow-up81 operator market expansion events tracked (27 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.81 events classified in last 90d, most recent 2026-09-28
- Infrastructurehigh60-90 days from filing3 faa corridor filing events tracked (2 high confidence). FAA aeronautical study cycle for corridor or facility determination. No direct AIS v2.0 score delta: An FAA study outcome validates airspace progress but is not a direct AIS v2.0 score input.3 events classified in last 90d, most recent 2026-09-24
Medium-term (60–180 days)1
- Infrastructurehigh3-12 months for build/permit cycle11 infrastructure development events tracked (6 high confidence). Infrastructure development announcement — typical permit-to-operational cycle 3-12 months. No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.11 events classified in last 90d, most recent 2026-09-16
Long-term (180+ days or unscheduled)1
- Regulatorymediumawaiting analyst reviewPending data point: hasActivePilotProgram = true (awaiting verification)Classifier output not yet promoted — medium confidence
Each forward signal here resolves against the public Predictions Ledger. First verifications start June 16, 2026; the public scoreboard ships with Pulse Issue 6 in July, after which every Pulse carries a running “Last Month's Calls” track record.