San Diego forward signals
Dated event calls with explicit resolution windows and direct AIS v2.0 score impact only where it is computable. Resolutions feed the public Predictions Ledger.
155 OE/AAA determinations in the development footprint — 120 structures studied near airspace, tallest 550 ft AGL; 55 crane/construction filings; 7 facility airspace studies.
Cumulative airspace-study footprint from FAA OE/AAA determinations geo-matched to this market — a development-intent indicator (towers, helipads, cranes studied for airspace effect). Density & composition, not a velocity claim.
Near-term (≤ 60 days)3
- Operatormedium30-180 days for operational follow-up12 operator market expansion events tracked (0 high confidence). Operator announcement — follow-on operational events typically follow. No direct AIS v2.0 score delta: An expansion signal is not itself curated OID deployment-stage credit; no numerical delta is assigned before operational follow-through.12 events classified in last 90d, most recent 2026-09-28
- Infrastructuremedium60-180 days for operational follow-up4 faa certification milestone events tracked (0 high confidence). Aircraft certification milestone — typically precedes operator deployment by 2-6 months. No direct AIS v2.0 score delta: Aircraft certification is not market-level OID deployment-stage credit; no direct market-score delta is assigned.4 events classified in last 90d, most recent 2026-08-06
- Regulatorymedium30-90 days
Medium-term (60–180 days)1
- Infrastructuremedium3-12 months for build/permit cycleinfrastructure development — Infrastructure development announcement — typical permit-to-operational cycle 3-12 months No direct AIS v2.0 score delta: An announcement does not change the v2.0 convertible-facility share until facility evidence is assessed.Classified medium confidence on 2026-09-04
Long-term (180+ days or unscheduled)1
- Regulatorymediumawaiting analyst reviewPending data point: activeOperatorPresence = true (awaiting verification)Classifier output not yet promoted — medium confidence
Each forward signal here resolves against the public Predictions Ledger. First verifications start June 16, 2026; the public scoreboard ships with Pulse Issue 6 in July, after which every Pulse carries a running “Last Month's Calls” track record.
Need more depth on San Diego?
The above is the light analytical layer. Institutional engagements unlock primary-source citations per factor, historical factor-level snapshots, methodology overrides with rationale, and analyst notes — at the depth a deployment decision actually requires.
Talk to us about depth access