Predictions Ledger · Orlando, FL
Forward call · Orlando
SunTrax Air — Florida AAM Headquarters (under construction) — FDOT
Direction
Neutral · validation event (no score change)
Confidence
HIGH
Window
under construction; operational target 2026-12
Latest expected
December 28, 2026
Status
INCONCLUSIVE
Resolved
September 2, 2026
Verified by
ANALYST
Actual outcome
Administrative data correction: faa_registered was already effective 2025-11-30, before this call was generated; excluded from accuracy.
Generated June 1, 2026 · signal type: facility_milestone · context: snapshot_cron
Reasoning
Signal classification: facility_milestone. The pipeline emitted this call from a high-confidence classification of source events. Where a direct numerical delta is shown, it reflects the cited Forward Signals methodology; event-only calls carry no numerical score claim.
Resolution driver: approvedVertiport. This source-domain key is used to match the call to a subsequently observed outcome; it does not by itself imply a score change.
Source signal: https://suntraxfl.com/suntrax-air/